The new plant built as a continuation to the existing Equate plant in the Shuaiba Area is multi billion dollar project executed by Fluor Int’l.

It is a joint venture between DOW, PIC Kuwait, Boubyan Petrochemicals and Qurain petrochemical industries.

Work on the plant was completed in August-2009.
AKU Co was involved in the detailed design, installation, testing and commissioning of Fire Alarm Systems from Siemens.

Areas installed with Siemens Fire Alarm System: WWT New Substation(P-001), SRU area substation building(SS-45A04), Utility Substation-B

Graphic Display Computer-16 Nodes
Total No. of Systems – 8
Total No. of Devices – 12,000