EQUIPMENT SUPPLIED:

Fittings, Couplings, Valves & Accessories   for  HVAC  Chilled  Water Piping

The oil generation plant at Wafra for the Joint Operations required an efficient and reliable system to be used on the long pipe runs of their HVAC Chilled Water System. Grooved Piping System was utilized for achieving superior performance in such a very adverse environment. FF System System was selected by the Consultant as a means of achieving the specific demands for accommodating the complex piping network coupled with ease of installation and huge savings in time on the installation Grooved System eliminated welding in all Black Steel lines which helped maintain cleanliness and safety during all stages of installation. This helped the contractor to meet the tight project schedule ,complex  and exposed piping network as well as supply of superior system to the client